Environmental management plans that turn approval commitments into clear site actions, named responsibilities and records your team can actually maintain.

Approval commitments translated into practical, auditable site controls

Selorin field team on site

Overview

An environmental management plan (EMP) is a project document that sets out how environmental impacts will be controlled, monitored and reported during construction or operation. A construction EMP (CEMP) covers site works and contractors, while an operational EMP (OEMP) covers the running facility. Both translate commitments from the EIA and environmental permit into specific actions, responsibilities, monitoring and records.

Environmental approvals in Saudi Arabia are typically granted on the basis of mitigation and monitoring commitments set out in the environmental impact assessment and reflected in the conditions of the environmental permit. Those commitments only have value if they are carried out on site. The environmental management plan is the operational link between the approval and day-to-day work: it states what must be done, by whom, how often, and what evidence must be kept to demonstrate compliance during inspections by the National Center for Environmental Compliance.

A construction EMP addresses the period of highest site activity: dust, noise, earthworks, dewatering, fuel and chemical storage, waste, traffic and the protection of nearby receptors. It must work for main contractors and subcontractors who change over the life of the project. An operational EMP addresses the facility once it is running: emissions, effluents, waste streams, maintenance, emergency response and periodic reporting. Both plans need realistic key performance indicators and clear escalation routes, so that non-conformances are identified and closed rather than discovered at audit.

Selorin prepares CEMPs and OEMPs that are specific to your project, permit conditions and site organisation rather than generic templates. We review the approval documents, map every commitment to a control measure and an owner, define monitoring parameters and frequencies, and set up inspection checklists, registers and reporting formats. Where needed, we brief contractors on their obligations and review their method statements and sub-plans for consistency with the approved EMP, so the plan is understood and implemented by the people doing the work.

When you need this service

You may need this service when:

  • Your environmental permit or EIA approval requires a CEMP before construction can start.
  • A facility is approaching commissioning and needs an operational EMP aligned with permit conditions.
  • The client or developer requires contractors to submit an environmental plan for approval.
  • An inspection or audit found gaps between approval commitments and actual site practice.
  • Several contractors are working on one site and environmental responsibilities are unclear.
  • An existing EMP is outdated after design changes, expansion or a change of operator.

What we deliver

01

Commitments register

A traceable list of every mitigation and monitoring commitment from the EIA, permit conditions and client requirements, each linked to a control and an owner.

02

Construction EMP (CEMP)

A site-specific plan covering dust, noise, water, soil, waste, hazardous materials, traffic and receptor protection during construction, with clear contractor obligations.

03

Operational EMP (OEMP)

A plan for the running facility covering emissions, effluents, waste, maintenance, emergency response, monitoring and periodic environmental reporting.

04

Roles and responsibilities

A responsibility matrix defining what the owner, operator, main contractor and subcontractors must do, approve, inspect and record under the plan.

05

KPIs and monitoring schedule

Measurable environmental performance indicators, with monitoring parameters, locations, frequencies and reporting routes linked to each significant aspect.

06

Implementation tools

Inspection checklists, registers, incident and non-conformance forms and reporting templates that site teams can use from the first day.

Our approach

  1. Review approvals

    We review the EIA, permit conditions, client specifications and site layout to identify every environmental obligation.

  2. Map commitments

    We map each commitment to an activity, a control measure, a responsible party and the evidence required.

  3. Draft the plan

    We prepare the CEMP or OEMP with sub-plans, monitoring schedule, KPIs and escalation procedures specific to the site.

  4. Align stakeholders

    We review the draft with the owner, operator and contractors and resolve gaps in roles or resources.

  5. Brief and launch

    We brief site teams and contractors, issue the implementation tools and confirm records are being kept correctly.

  6. Review and update

    We update the plan after design changes, audits, incidents or new permit conditions, keeping version control.

Deliverables

DeliverableFormatStage
Environmental commitments registerRegister (Excel)Start of preparation
Construction environmental management plan (CEMP)Plan with topic sub-plans (PDF + editable Word)Before construction mobilisation
Operational environmental management plan (OEMP)Plan with monitoring programme (PDF + editable Word)Before commissioning
Responsibility matrixRACI table (Excel + PDF)With the plan
Inspection checklists and registersEditable forms (Excel + Word)With the plan
Contractor briefing packPresentation and summary sheet (PDF)At mobilisation or handover

Regulatory context

  • Environmental Law (2020) and its Implementing Regulations, which link project approval to the implementation of mitigation and monitoring measures.
  • National Center for Environmental Compliance (NCEC), which issues environmental permits and carries out compliance monitoring and inspections.
  • Waste Management Law and the requirements of the National Center for Waste Management (MWAN) for handling, storage and transfer of waste on site.
  • Royal Commission for Jubail and Yanbu (RCJY) and MODON, where site-specific environmental requirements apply within their areas.
  • ISO 14001 principles for planning, operational control, monitoring and continual improvement, where the organisation uses an environmental management system.

Requirements vary by activity, location and permit conditions. We confirm the applicable requirements for your project at the start of every engagement.

Industries served

Frequently asked questions

What is the difference between a CEMP and an OEMP?

A CEMP covers the construction phase, when the main risks come from earthworks, dust, noise, temporary storage of fuel and chemicals, construction waste and contractor activity. An OEMP covers the facility once it is operating, focusing on process emissions, effluents, waste streams, maintenance, emergency response and routine monitoring and reporting. Many projects need both, prepared at different stages but built on the same approval commitments.

Can we use the contractor's standard environmental plan?

A contractor's standard plan is a useful starting point, but it rarely reflects the specific commitments in your EIA and permit conditions. We review it against your approval documents, identify missing controls, monitoring requirements or responsibilities, and either adapt it or prepare a project plan that the contractor's procedures must comply with. This avoids gaps that may only become visible during an inspection.

How detailed should the KPIs be?

KPIs should be specific enough to show whether controls are working and simple enough for site teams to track. Typical examples include the percentage of inspections closed on time, the number of open non-conformances, monitoring results compared with applicable limits, and waste segregation and transfer records. We select indicators linked to your significant aspects rather than a long list that nobody uses.

Who is responsible for implementing the EMP?

Responsibility is shared, and the plan should say exactly how. The project owner or operator remains accountable for compliance with the permit, while contractors are responsible for the controls within their scope of work. The EMP includes a responsibility matrix that sets out who implements, inspects, approves and records each measure, so obligations can be written into contracts and checked during site inspections.

How often should an EMP be updated?

An EMP should be updated whenever something material changes: the design, construction method, site boundary, contractor, permit conditions or applicable requirements. Audit findings and incidents are also triggers for review. Outside these events, a periodic review keeps the plan aligned with how the site actually works. Each revision should be version-controlled and communicated to the people who rely on it.

Related services

Environmental Impact Assessment

Screening, scoping, baseline studies, impact analysis and mitigation, prepared as an EIA report ready for authority review and follow-up comments.

Key benefit: A defensible EIA that keeps your approval path predictable

Environmental Compliance

Ongoing compliance management: obligation registers, inspection readiness, responses to regulatory notices and violations, and corrective action plans that close gaps.

Key benefit: Lower exposure to violations and operational disruption

Environmental Monitoring

Design and delivery of multi-media environmental monitoring programmes: sampling plans, field work, laboratory coordination, data QA/QC and periodic compliance reports.

Key benefit: Defensible environmental data that keeps permit reporting on track

Environmental Records and Reporting

Environmental registers, periodic and self-monitoring reports, and data management systems that keep your records accurate, traceable and ready for inspection.

Key benefit: Reliable environmental data, available when it is needed